Customized Automatic High Speed Two Lines PLA T-Shirt Vest PE Fruit Vegetable Shopping Supermarket Flat Grocery Shopping Bag on Roll

US$11,000.00 1 Set (MOQ)
Port:
Ningbo, China
Production Capacity:
100 Set/Month
Payment Terms:
L/C, T/T, D/P, Western Union, Paypal, Money Gram

Last Login Date:

Jan 17, 2024

Business Type:

Manufacturer/Factory

Main Products:

Film Blowing Machine, Bag Making Machine, Flexographic Printing Machine, Rotogravure Printing Machine, Film Slitting Machine, Paper Bag Machine, Machine Accessory, Plastic Bag Making Machine, Film Extruder Machine, Film Blown Machine

Find Similar Products

Product Description

Company Info

Basic Info.

Model NO.
GR-450*2
After-sales Service
24 Hours Per Day
Warranty
18 Months
Product Line
T-Shirt Bag Production Line
Lines
2
Voltage
380V
Seals Mode
Center Seals
Speed
Medium
Continuous-Rolled
No
Sealing & Cutting
Heat-Sealing Cold-Cutting
Layer
Double
Machine Type
Bag Forming Machine
Computerized
Type
Plastic Bag Making Machine
Trademark
GUORAN
Transport Package
Pallet&Wooden Case
Specification
CE. ISO9001
Origin
China
HS Code
8441200000

Product Description

 
High Speed Automatic Double lines Plastic T-Shirt Bag Machine Professional Manufacturer
   
Product Description

These machines are heat sealing and heat cutting bag making machine, which are suit for printing and non-printing bag making. The material of bag is HDPE, LDPE, PLA,BPAT (Biodegradable  Decomposable)

Detailed Photos

Product Parameters

GR-500*2 T-shirt bag making machine is special design for 2 lines high speed T-shirt bag production . 2 independent computers control design and driven by 4.4 kw servo motor, high efficiency, easy and stable operation, low noise, non-stop working. Suitable for producing disposable plastic T-shirt bags.
 

TECHNICAL PARAMETER
ModelGR-BXD-500V2
Bag Width200mm - 500mm
Bag Length330mm - 650 mm
Film thickness10-35µm
Production Speed100-300pcs/min*2 Lines
Set Line Speed110-150m/min
Film Unwind DiameterΦ900mm
Total Power16KW
Air consumption6HP
Machine Weight2800KG
Machine DimensionL7500*W1700*H1900mm
e
Feature and structure
1. Main control panel adopt touch screen Delta from Taiwan, high definition

2. The drive system of whole machine adopts PLC Microcomputer control (Single Chip control system ) on punch machine which integrate control of bag making part and punching part.

3. Set all function with one touch screen, simple and easy operation.

4. Machine will automatically stopped if film jammed which is detected by sensor

5. Independent winder part, high efficient unwind control; max diameter of single unwinding is 800mm; unwinding roller is choked by air shaft,

6. Automatic fold function and put on conveyor unit by unit.

7. Automatic stacks the bag and collects.

8. When the bags stack at the Set numerical, mechanical hands will automatically grab bags and machine will not stop.) on punch machine which integrate control of bag making part and punching part.
ature and structu
Fee d structur
Certifications

Packaging & Shipping

Company Profile
Company Brief Introduction
We were founded in 1997 (Formerly known as Guoran plastic packaging machinery factory). For more than 21 years, we focus on researching, developing, manufacturing and marketing on plastic bag making machine. Our  products include :
1.Film blowing Machine 
2.Plastic T-shirt Bag Making Machine
3.Vegetable Bag on Roll Making Machine With Core
4.Flexo Printing Machine 
5.Film Slitting Machine 

There are more than 54 countries and regions cooperating with us, such as south Korea,
Turkey, Malaysia, Russia,Iran, Ethiopia, Chile, Saudi Arabia, Peru, Algeria,Vietnam,Columiba,etc.
After Sales Service
The condition of machine operating
A. illumination no exceed 3000LX
B. altitude no exceed 1000m
C. The temperature of stuff around the machine should be no higher than
+40ºC and no lower than -20ºC.
D. The relative humidity of air no exceeds 85%.
E. The place should no have conductive dust.
F. Circumstance of no blast danger and fire.
FAQ
FAQ
1.Q: How long will your engineer reach our factory?

  A: Within 7-15 days after machine arrival your factory.
2. Q: How many days will you finish installing ?

    A: We will finish installation and training within 3-7 days.
3. Q: What should we charge for your engineer?

    A: You should charge for the cost of our engineer's visa , round trip tickets, accommandation, and also their salary 100USD one day per person.
4. Q: How long is your machine's warranty period?

    A: All our machine have one year guarantee, starting from finished installation.
5. Q: How could we do after one year warranty period?

    A: We also can do service for you, but you need pay salary for my technician 100USD/day.
6. Q: How could we do if the parts broken within warranty?

    A:We would express the free replacement parts during the warranty date.
 7. Q: Does your engineer understand English?

    A:Our engineer understand a little English. All of our engineers have more than five years machine installation experience. 
8. Q: How many worker do we need running those machines?

      A: Usually need one person to opertate the machine.
9. Q: How do we solve the machine problem after your engineer leaving?

    A: Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according your description.
10. Q: How can I visit your company?
     
     A : It takes 50 minutes by car from Wenzhou Air Port to our factory .
         And it takes only 10 minutes by car from Ruian train station to High Sea factory .
 
 
 
 
 
 


 
 
 
 
 
 
 
Send your message to this supplier
Mr. Kevin

Post a Sourcing Request Now

People who liked this also liked